Structural steel for large-scale mining

Structural steel for large-scale mining

Over 18,900 tons for Minera Escondida’s OGP1, and more than 300 contracts since 1989.

Discover more
01 / 04
Vision

Structural steel fabrication and erection for mining, energy and infrastructure

From our plant in Talcahuano, Chile, we detail, fabricate, coat and erect steel structures for the most demanding projects in Chile and Latin America. Over 75 years of experience stand behind every ton.

About the company
tons of steel fabricated
1.5 M
projects completed
4,000+
monthly fabrication capacity
2,000 t
years of experience
75+
Values

What guides us

Talcahuano plant
Production

Talcahuano plant

36,000 m² of fabrication bays, 10,000 m² of painting bays and capacity to fabricate 2,000 tons per month, next to the ports of San Vicente and Talcahuano.

Discover more
Quality

Built to code, verified in our plant

Our Quality Department checks every piece with dimensional inspection, non-destructive testing and coating tests before it ships.

Explore our quality control
  • AWS D1.1Structural Welding Code — Steel
  • AWS D1.5Bridge Welding Code
  • NCh 428Chilean standard for steel construction
  • Dimensional inspectionDimensions and tolerances checked on every piece
  • NDT · VT · PT · MT · UTLevel III inspector per ASNT SNT-TC-1A
  • Coating testsDry film thickness (DFT), dolly adhesion and holiday testing
Business areas

Full-scope steel capabilities

Business areas
Build the future in steel
Careers

Build the future in steel

Welders, fitters, engineers and technicians: we are looking for people who want to grow with us in the Biobío region.

See opportunities