Over 4,000 projects completed in Chile and Latin America. A selection of our work.
Featured projects
Mining · Minera Escondida · 18,921 t
OGP1
Structural steel for the grinding building and additional works of Minera Escondida’s OGP1 project.
Mining · Codelco · 14,700 t
Codelco Ministro Hales
Structural steel for the plant and conveyors of Codelco’s Ministro Hales division.
Mining · 32,050 t
Sierra Gorda
Structural steel for the plant, conveyors and truck shop of the Sierra Gorda mining project.
Mining · 14,380 t
Esperanza Project
Structural steel for the Esperanza project and its expansion.
Mining · Collahuasi · 16,693 t
Collahuasi
Six contracts between 1996 and 2023: concentrator plant, conveyors, truck shop and desalination plant.
Mining · Teck · 8,100 t
Quebrada Blanca II
Structural steel for Quebrada Blanca II, including the truck shop.
Mining · Codelco · 8,470 t
Codelco Gabriela Mistral
Buildings, truck shop and bins for Codelco’s Gabriela Mistral division.
Mining · BHP · 2,000 t
Spence Growth Option (SGO) modularization
Pre-assembled steel modules for Spence Growth Option.
Mining · 5,849 t
Cobre Panamá
Structures, tanks and chutes for the Cobre Panamá mine.
Bridges · 6,500 t
New Biobío railway bridge
Structural steel and architectural structure for the new railway bridge over the Biobío River.
Bridges · 2,700 t
Américo Vespucio Oriente I viaduct
Steel box girders for the El Salto viaduct of Américo Vespucio Oriente I in Santiago.
Bridges · 1,049 t
Américo Vespucio Norte – Ruta 68 viaduct
Steel girders for the viaduct connecting Américo Vespucio Norte and Ruta 68.
Bridges · 3,174 t
Bicentenario Bridge
Steel girders for the Bicentenario Bridge over the Biobío River in Concepción, including stage 3.
Bridges · 1,892 t
Amolanas viaduct
Structural steel for the Amolanas viaduct on Ruta 5 Norte.
Bridges · 1,700 t
Toltén railway bridge
Structural steel for the railway bridge over the Toltén River.
Bridges · 800 t
Río Cruces Bridge
Steel girders for the bridge over the Cruces River.
Energy · 10,000 t
GNL Quintero LNG terminal
Structural steel for the Quintero liquefied natural gas terminal.
Energy · 9,014 t
Bocamina power plant
Structural steel, cladding structures and siphon structures for the Bocamina thermal power plant.
Ports · Conix · 700 t
Aconcagua desalination plant pier
Structural steel for the pier of the Aconcagua desalination plant.
Ports · Bechtel · 3,000 t
Quebrada Blanca II Pier
Structural steel for the Quebrada Blanca II pier.
TGN loading pier
Structural steel for Terminal Graneles del Norte's loading pier in Mejillones.
Ports · Engie · 2,711 t
Blue Dolphin pier
Structural steel for the Blue Dolphin bulk unloading terminal in Mejillones Bay.
Ports · Empresa Portuaria Austral · 472 t
Prat Pier
Structural steel for the expansion of Punta Arenas' Prat Pier.
Ports · Belfi · 700 t
Port of Coquimbo
Structural steel for the Port of Coquimbo.
Pulp & forestry · Arauco · 13,300 t
MAPA Project
Structures for boilers and buildings of the Arauco mill Modernization and Expansion project (MAPA).
Pulp & forestry · Arauco · 5,122 t
Arauco Valdivia pulp mill
Structures, tanks and miscellaneous steel for Arauco’s Valdivia pulp mill.
Pulp & forestry · CMPC · 3,812 t
CMPC Santa Fe
Structures for the recovery boiler and lime kiln of CMPC’s Santa Fe mill.
Pulp & forestry · 3,800 t
Orion pulp mill
Structures for the recovery boiler of the Orion pulp mill in Uruguay.
Pulp & forestry · CMPC · 600 t
Laja pulp mill tank
600-ton tank for the Laja pulp mill.
Energy · Methanex · 80 t
Methanex stack
80-ton steel stack for Methanex in Magallanes.
Pulp & forestry · CMPC
CMPC Laja wood debarking drum
Fabrication of a wood debarking drum for CMPC's Laja mill.
Energy · ENAP
ENAP Biobío Refinery stack
Fabrication and delivery of a steel stack for ENAP's Biobío Refinery.
More experience
A selection from our more than 4,000 fabrication contracts, delivered in 8 countries: Argentina, Bolivia, Brazil, Chile, Panama, Peru, Trinidad and Tobago and Uruguay.
| Project | EPC / Contractor | Sector | Country | Tonnage | Year |
|---|---|---|---|---|---|
| Ruta Nahuelbuta bridges | Besalco – Belfi | Bridges | Chile | 2,400 t | 2021 |
| SQM – Lithium carbonate plant | SQM | Mining | Chile | 5,200 t | 2020 |
| Cristalerías Chile | Wood | Industrial plants | Chile | 3,000 t | 2018 |
| Santiago Airport expansion | Vinci – Astaldi | Infrastructure | Chile | 1,800 t | 2018 |
| BHP – Water supply | Bechtel | Mining | Chile | 4,000 t | 2014 |
| Antucoya mining project | Sandvik | Mining | Chile | 8,000 t | 2013 |
| Minas Conga | Fluor | Mining | Peru | 2,000 t | 2011 |
| Montes del Plata – Pipe bridge | Pöyry | Pulp & forestry | Uruguay | 1,850 t | 2011 |
| GNL Mejillones terminal | Belfi | Energy | Chile | 3,000 t | 2010 |
| Petrotrin refinery | Techint | Industrial plants | Trinidad and Tobago | 2,000 t | 2010 |
| Las Tórtolas | Bechtel | Mining | Chile | 4,000 t | 2009 |
| Guacolda III thermal power plant | MHI | Energy | Chile | 2,500 t | 2007 |
| CMP – Magnetite plant | ARA | Mining | Chile | 4,000 t | 2006 |
| San Cristóbal mine | Kvaerner | Mining | Bolivia | 4,000 t | 2005 |
| Ilo smelter | Fluor | Mining | Peru | 4,000 t | 2004 |
| Codelco El Teniente | Kvaerner | Mining | Chile | 3,338 t | 2003 |
| Minera Escondida – Phase IV | Fluor | Mining | Chile | 7,818 t | 2000 |
| Maule Bridge | Belfi | Bridges | Chile | 1,889 t | 2000 |
| Minera Los Pelambres | Bechtel | Mining | Chile | 9,192 t | 1998 |
| Cerro Vanguardia | Skanska | Mining | Argentina | 4,000 t | 1997 |
| Minera Escondida – Phase III | Fluor | Mining | Chile | 14,000 t | 1994 |
| Disputada de Las Condes mine | Bechtel | Mining | Chile | 6,000 t | 1992 |
| Arauco pulp mill – Line II | Pulp & forestry | Chile | 11,200 t | 1989 |